XiDRT™ Digital Urban Rail Transit Solution
TRANAVI Qiji® Train Autonomous Control System (TACS)
Urbalis® 888 Train Control System Solution
TRANAVI® Train Control System Solution
SmarTram® Intelligent Control System Solution
INTXIS(CTCS2+ATO)Train Control System Solution
Beidou Positioning Based Train Autonomous Control System (TACN)
Centralized Traffic Control System (FZk-CTC)
Train Dispatching Command System (TDCS)
Railway Integrated Dispatching System (RIDS)
Computer Interlocking System (iLOCK-II / iLOCK-IIE / iLOCK-IIT)
Computer Interlocking System (iLOCK / iLOCK-E)
Compute Interlocking System (VPI)
After the operation of the railway, it connects with Golmud-Korla, Kashgar-Hotan and Southern Xinjiang railways, forming a 2712-kilometer loop line circling the Taklamakan Desert, and becoming the world's first railway loop in the desert.
Read moreCASCO provided interlocking, train control, monitoring and temporary speed restriction server for the entire line. It is also CASCO’s first national railway integration project in the true sense which was fully implemented in accordance with the national railway integration standards after CASCO completed the integration pilot of train control of Yunnan-Guizhou railway.
Read moreThe Pearl River Delta Intercity Railway includes Dongguan-Huizhou Intercity Railway and Foshan-Zhaoqing Intercity Railway, of which the former, applied CASCO’s C2+ATO signaling system.
Read moreBeijing-Shanghai High-speed Railway is one of the mainlines in the eight vertical and eight horizontal high-speed railway network in the national Medium and Long-Term Railway Network Plan.
Read moreNanchang-Jingdezhen-Huangshan High-speed Railway
CASCO provided iLOCK interlocking and FZk-CTC3.0 centralized traffic control systems to fully ensure the opening and operation of the project.
Jingbian - Shenmu Railway
TACN has completed the full-load heavy haul train tracking test on Jingbian-Shenmu Railway
Hainan West Ring Bus Tourism Railway
CASCO provided 8 CSM-KA 2020 monitoring systems for the railway, and modified 12 CSM-KA 2010 monitoring station subsystems and the monitoring center of Haikou section, which were synchronously connected to the monitoring center of Guangzhou Bureau.
Jinhua-Taizhou Railway
CASCO provided customized railway integrated dispatching system (RIDS), which realized data exchange and information sharing among various jobs and systems and greatly enhanced the intelligent operation in the dispatching command center of Jinwen Railway Company.
Pingmei Railway
TACN was officially launched on the railway in the mining area of China Pingmei Shenma Group, marking an important upgrade and key breakthrough in the technical equipment of local railways
Qinghai-Tibet Railway Signaling System Renovation
The Golmud-Lhasa section of Qinghai-Tibet Railway is equipped with CASCO’s CTC and CSM system, and the only one ITCS system in China. CASCO upgraded the above existing systems and equipped the new stations with matching signaling systems.
11F, Building 2, Shibei One Center, No. 21, Lane 1401, Jiangchang Road, Jing'an District, Shanghai
86 -21-5663 7080
041-35775(Railway)