Celebrating National Day, CASCO Supports Multiple Rail Transit Lines into Revenue Service

29 Sep 2025

From September 28 to 29, just before the National Day, multiple rail transit lines that CASCO participated in commenced revenue service, including five metro lines and five high-speed and intercity railways. This collective delivery not only showcases CASCO's exceptional project execution capability, but also propels its domestic CBTC operational mileage to over 3,300 kilometers and contributes to the construction of the national railway network. It is a tribute to the 76th anniversary of the motherland, injecting robust momentum into China.


Five Metro Lines Launched Together, Building Urban Transportation Arteries


Xuzhou Metro Line 6 Phase I



With a total length of 22.919 kilometers and 16 stations, it is the first fully automatic driverless line in Xuzhou City. CASCO provided GoA4 fully automatic driverless signaling system and took the lead in coordinating and managing the relevant specialties for fully automatic operation, as well as implementing the technical solutions for fully automatic linkage functions. Additionally, CASCO supplied it with an integrated platform screen door system with SIL4, the highest safety level. This innovative product, through the deep integration of the platform screen door system and the signaling system, enables direct control of platform screen doors by onboard equipment, significantly enhancing the efficiency, reliability, and safety of door opening and closing.


Shenzhen Metro Line 16 Phase II and Line 6 Branch Phase II



Line 16 Phase II (Dayun Station - Yuanshan Xinkeng Station) spans about 9.54 kilometers with 8 stations, while Line 6 Branch Phase II (Guangming Station - Guangmingcheng Station) extends about 4.95 kilometers with 3 stations. CASCO provided both lines with a GoA4 fully automatic driverless signaling system, offering advanced technological services for efficient public transportation. The simultaneous launch of these two lines not only strengthens transportation links between Shenzhen's Guangming District and the central city, as well as within the eastern area, but also further improves the layout of Shenzhen's public transportation network, helping the total operational mileage of Shenzhen's urban rail transit network exceed 600 kilometers.


Changchun Metro Line 2 East Extension



The line is approximately 10.6 kilometers long with 6 stations, including Zhaojiagang Station, which allows transfers to Metro Line 9 under construction for access to Longjia International Airport. CASCO provided it with CBTC signaling system, enabling seamless operation with the existing Line 2. Once in operation, it will further enhance the transportation capacity of Line 2 as a key east-west rail transit artery in Changchun City, effectively alleviating passenger flow pressure at Changchun West Station. Meanwhile, it injects transportation momentum into the development of the Lotus Mountain Eco-Tourism Resort along the route, holding significant importance for promoting coordinated regional development.


Guangzhou Metro Line 13 Phase II Eastern Section



The line is approximately 8.3 kilometers long with 4 stations. CASCO provided CBTC signaling system and simultaneously completed the relocation of the Guanhu Control Center, the initial project's control center, to the Chisha Regional Control Center, strongly supporting Guangzhou Metro's upgrade from a "single-line independent dispatching" to "network-centralized control". After the line's opening, Line 13 will officially upgrade from a "suburban line" serving the city's periphery to a "urban line" traversing the central city, effectively improving commuting efficiency between the eastern and western areas and the central city, and providing reliable transportation support for the upcoming 15th National Games.


Five High-Speed and Intercity Railways Launched Together, Densifying the National Railway Network


Shenyang-Baihe High-Speed Railway (Shenyang North - Changbaishan)



The line is approximately 430 kilometers long with 9 stations. CASCO provided FZk-CTC 3.0 centralized traffic control system and CSM-KA signal centralized monitoring system. As a key railway project in the national "14th Five-Year Plan", this line successfully reduces the travel time from Shenyang to Changbaishan from 4 hours to within 2 hours, helping Liaoning Province achieve high-speed railway connectivity between all cities and ending the history of no high-speed rail access in Tonghua and Baishan in Jilin Province. It further optimizes and improves the high-speed railway network layout in Northeast China, accelerating tourism resource development and economic growth along the route.


Xiangyang-Jingmen High-Speed Railway (Xiangyang East - Jingmen West)



The line is approximately 116 kilometers long with 3 stations. CASCO provided iLOCK computer interlocking system and FZk-CTC 3.0 centralized traffic control system. As a key project in the national "14th Five-Year Plan", this line, together with the Hanzhong-Shiyan High-Speed Railway and Hankou-Yichang Railway, forms the first high-speed railway loop in Hubei Province. After the line's operation, the travel time from Xiangyang to Jingmen can be shortened to about 30 minutes, strongly promoting coordinated development in the "Golden Triangle" region of Wuhan, Xiangyang, and Yichang. It holds significant strategic importance for serving high-quality development in the Yangtze River Economic Belt and supporting the rise of central China.


Guangzhou East Ring Intercity Railway, Palian Intercity Railway, and Guanghui Intercity Railway Northern Extension



The Guangzhou East Ring Intercity Railway (Panyu - Baiyun Airport North) is approximately 57.8 kilometers long with 13 stations. CASCO provided FZk-CTC 3.0 centralized traffic control system, iLOCK computer interlocking system, and LKD2-KA train control center system. The Palian Intercity Railway is approximately 18.2 kilometers long with 4 stations. CASCO provided LKD2-KA train control center system and completed the supporting revamping of dispatching, interlocking, and train control software at Lianhuashan Railway Station. The Guanghui Intercity Railway Northern Extension is approximately 6.4 kilometers long with 2 stations. CASCO provided FZk-CTC 3.0 centralized traffic control system. After the launch of these three lines, it will greatly facilitate the travel and transfers of residents in Guangzhou, Qingyuan, Huizhou, Zhaoqing, and other places, helping the intercity railways in the Greater Bay Area achieve a leap from "lines" to a "network."


From south to north, from national transportation arteries to regional intercity transportation, the launch of one new line after another continuously outlines a new picture of a dynamic China on rails. As an active practitioner in building a strong transportation nation, CASCO will continue to delve into the research and development of intelligent control technologies, providing strong support for the high-quality development of China's rail transit and striving towards a bright future where "people can travel conveniently and goods can flow smoothly".

Top

Wechat

Shanghai Headquarter|Branches

11F, Building 2, Shibei One Center, No. 21, Lane 1401, Jiangchang Road, Jing'an District, Shanghai

86 -21-5663 7080
041-35775(Railway)

© 2019 CASCO Signal Ltd.. All Rights Reserved. 沪ICP备19030504号