Supporting the World Cup, CASCO Safeguards Mexico's Rail Transit

06 Jul 2026

The World Cup is back in full swing. Recently, the group stage matches in Mexico have captured global attention. Behind this grand sporting event, CASCO, a Chinese rail transit enterprise is already on the field. Leveraging a series of local rail transit projects, CASCO continuously safeguards train operations like a reliable "goalkeeper", and manages precise dispatching like a wise "coach", to ensure the efficient mobility of the city's rail transit, thereby supporting the smooth hosting of the tournament.


Mexico City Metro Lines 1–6 PCC Reconstruction

Successful "Brain Transplant" Wins High Praise from Mexican Client


In early 2021, the control center of the Mexico City Metro was damaged by a fire, posing severe challenges to the operational efficiency and safety of Lines 1–6. Facing multiple difficulties such as outdated equipment and missing drawings, CASCO rose to the challenges and assisted the client in completing the post-disaster reconstruction within one year. This not only restored the control center's train monitoring functions, but also achieved a technological leap forward, earning high recognition from the Mexican client.



Mexico City STE Light Rail Control System Renovation

Revitalizing an Old Line for Direct Access to the Stadium


The Mexico City STE Light Rail, opened in 1986, is 13.04 km long with 18 stations, directly serving the Estadio Azteca – the venue for the World Cup opening ceremony, group stage, and knockout matches. Leveraging its extensive experience in existing line renovation, CASCO customized the communication and signaling system upgrade solution for the line, which will significantly enhance key capabilities such as train tracking and communication dispatching.



Guadalajara Light Rail Line 4

New Line Debut for Convenient Transfers and Efficient Travel


Guadalajara Light Rail Line 4 is 21.16 km long with 8 stations. The line brings the densely populated southern part of the city into the rail transit network. By taking this line and transferring to the BRT loop, passengers can easily reach the Estadio Akron, the venue for the group stage matches. CASCO is responsible for the systems integration of communications, signaling, integrated monitoring, and AFC for this line, adding another efficient and reliable green corridor for the area and offering more convenient travel options for fans and local residents.



From Mexico City to Guadalajara, CASCO has earned wide recognition in the Latin American market through its solid technical strength and excellent delivery capabilities. This is a vivid reflection of CASCO's deep cultivation of overseas markets and its continuous breakthroughs. In 2026, CASCO is simultaneously advancing more than 10 overseas projects across countries and regions including Dubai (UAE), Australia, Egypt, and Guinea, covering various service types such as new line construction, existing line renovation, and technical consulting, with its global business footprint continuing to expand.


The World Cup brings millions of hearts together in shared passion, while CASCO connects the world more closely through smart rail transit. Looking ahead, CASCO will continue to uphold its professional and reliable pragmatic spirit and pioneering innovative spirit, serving global customers and creating better travel experiences.

Top

Wechat

Shanghai Headquarter|Branches

11F, Building 2, Shibei One Center, No. 21, Lane 1401, Jiangchang Road, Jing'an District, Shanghai

86 -21-5663 7080
041-35775(Railway)

© 2019 CASCO Signal Ltd.. All Rights Reserved. 沪ICP备19030504号