XiDRT Digital Urban Rail Transit Solution
TRANAVI Qiji® Train Autonomous Control System (TACS)
Urbalis® 888 / TRANAVI® CBTC System Solution
SmarTram® Intelligent Control System Solution
XeDRT Digital Freight Solution
Beidou Positioning Based Train Autonomous Control System (TACN)
Centralized Traffic Control System (FZk-CTC)
Train Dispatching Command System (TDCS)
Railway Integrated Dispatching System (RIDS)
Computer Interlocking System (iLOCK-II / iLOCK-IIE / iLOCK-IIT)
Computer Interlocking System (iLOCK / iLOCK-E)
Compute Interlocking System (VPI)
Recently, CASCO successfully won the bid for the signaling system renovation EPC at the TURA Depot of Cairo Metro Line 1. With its independent core rail transit technologies as the backbone and a strong focus on localized operations, CASCO continues to deepen its presence in overseas markets, upgrading its business model from technology export to ecosystem integration, and adding a new achievement to the high‑quality development of the Belt and Road Initiative.
The TURA Depot signaling system renovation project adopts an EPC model. CASCO is responsible for the full scope of signaling system design, procurement, and construction. The project will replace the old systems with a new generation of products, including full electronic computer‑based interlocking system, automatic train supervision system, maintenance support system, power supply system, axle counters, point machines, and signals.
Cairo Metro Line 1, which entered service in the 1980s, is the city's oldest and busiest metro trunk line. As the largest rolling stock maintenance and stabling facility on the line, the TURA Depot has been in operation for over 40 years. Its aging signaling equipment has become an increasingly prominent issue, making this renovation a critical prerequisite for the line's broader modernization plan.
Layout of the TURA Depot
This renovation is not merely a hardware replacement – it is a comprehensive systemic upgrade that addresses both safety and operational efficiency.
This renovation project marks another significant milestone for CASCO in the Egyptian market, following the successful delivery of the 10th of Ramadan Railway. As Egypt's first CBTC line, the 10th of Ramadan Railway project earned CASCO deep trust from the Egyptian client. The continuation of this trust is built upon CASCO's sustained investment in local service – from long‑term technical support after project delivery, to rapid response to local operational needs, to the permanent presence of local teams on the ground. It is precisely this service capability that enables CASCO to precisely meet client requirements and stand out in the competition.
In recent years, CASCO has closely followed CRSC's internationalization strategy, focusing on key regions and core country markets, and adhering to a coordinated approach of exporting technology, equipment, standards, and services. By continuously enhancing its localization and service capabilities, CASCO has transitioned from simply "going global" to truly "going local", from individual project to systematic cultivation, consistently contributing Chinese expertise to the development of global rail transit.
11F, Building 2, Shibei One Center, No. 21, Lane 1401, Jiangchang Road, Jing'an District, Shanghai
86 -21-5663 7080
041-35775(Railway)